Project Management Services - providing application engineering services to add additional cooking capacity to existing burrito filling operation. Sourcing new cooking equipment along with required sanitary pumps, valves & instrumentation. Coordinated all equipment utility requirements and mechanical installation work, general arrangement drawings, process flow diagrams, P&ID, controls & automation upgrades, CIP System, air-cooled chiller.
Addition of Spiral Freezer including all transfer conveyors, including robotic material handling systems designed to meet specific material handling needs. Installation of New Tortilla Production Line. Application Engineering Details for Blentech Cooking System including 3 Tank CIP System. Equipment Layout Drawings, Utility Requirements Documentation, Project Management responsibilities for entire project.
Providing application & design engineering services for a 24 million pounds per year pet food production line. Sourced all new cooking & cooling equipment as well as a complete material handling "end of line" solution. Providing general arrangement drawings, process flow diagrams, coordinating all utility requirements, mechanical installation work, controls & automation and CIP integration. Also sourced used processing and material handling equipment to enable customer into production while waiting for new equipment arrivals. (See project photos)
Multiple Mac & Cheese Production Lines with throughputs ranging from 6,000 to 18,000 pounds per hour.
Regular & USDA Mac & Cheese
Pet Food Project (Cook & Vacuum Cooling)